Smart Power replaced equipment such as panels and possibly inverters in old PV power stations from 20kWp to 1MWp.
In this action the criteria were:
The selling price of energy.
The power of the PV park.
The cost of replacement with new equipment (the panels, after a study if necessary on the cables or the metal structure supporting the frames).
Tax incentives